Installation of a pumping station into an underground pit, designated as a water source for the fire protection system in the ZSE area (NITRA-Krškany).
Installation of a pumping station into an underground pit, the station serves as a source of pressure water for the fire protection system in the ZSE premises (Nitra - Krškany). ATS delivered to the DP were removed on site, individual parts were cranked into a pit, including a 500 liter pressure vessel , and then the ATS was assembled and put into operation including operator training .
Technical Label | HU 3 DPVF 40 / 2-2 60Hz MCMF |
Flow | 0-150 m3 / hr |
Pressure control for constant P | 4 bar (40 m) |
Installed Performance | 3 x 11 kW |