Development, production and testing of a high pressure unit designed to water injecting to the oil field to increase the pressure and thereby stimulate production.
Design, development and production of a prototype unit and testing. The prototype high-pressure unit has been designed as a test facility for development tests in the oil industry .
In order to improve productivity and to increase oil recovery from an existing reservoir by pumping the process water into the petroleum reservoir. This prototype unit is assembled with a WOMA 150 pump and a EBARA as booster pump.